{"id":17708,"date":"2026-01-30T09:25:22","date_gmt":"2026-01-30T09:25:22","guid":{"rendered":"https:\/\/tenthplanet.in\/idempiere\/?p=17708"},"modified":"2026-10-07T09:38:52","modified_gmt":"2026-10-07T09:38:52","slug":"how-issue-to-project-works-in-idempiere","status":"publish","type":"post","link":"https:\/\/tenthplanet.in\/idempiere\/how-issue-to-project-works-in-idempiere\/","title":{"rendered":"How Issue to Project Works in iDempiere"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In <strong>iDempiere ERP<\/strong>, Issue to Project enables users to issue materials directly to a <strong>project<\/strong>. This process is typically used when inventory materials, received via <strong>Material Receipt<\/strong> or recorded in a <strong>Manual Inventory Location<\/strong>, need to be allocated to a specific project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This process allows organizations to manage <strong>inventory usage for specific projects<\/strong>, ensuring that the materials are properly tracked and billed, and that the project\u2019s expenses are updated accordingly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Process Flow Diagram<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"303\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject-1024x303.png\" alt=\"\" class=\"wp-image-20388\" title=\"\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject-1024x303.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject-300x89.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject-768x228.png 768w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject-1536x455.png 1536w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/Issuetoproject.png 1833w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Issue Material Process<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><br><strong>Project Selection<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The first step in the <strong>Issue to Project<\/strong> is selecting the <strong>project<\/strong> that the material will be issued to.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Projects<\/strong> in iDempiere are usually linked to a specific <strong>cost center<\/strong> or <strong>task<\/strong>, and materials issued to the project will be tracked as project expenses or part of the project\u2019s inventory needs.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><br><strong>Material Sources<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">You can issue materials to the project from two primary sources:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Material Receipt<\/strong>:\n<ul class=\"wp-block-list\">\n<li>If you have already received materials through <strong>Material Receipts<\/strong>, you can issue those materials directly to the project.<\/li>\n\n\n\n<li>Materials already received will appear as available for allocation.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Expense Report &#8211; Inventory Location<\/strong>:\n<ul class=\"wp-block-list\">\n<li>You can also manually select an <strong>Inventory Location<\/strong> where the materials are stored, as well as the <strong>Product<\/strong> and <strong>Quantity<\/strong> of materials to be issued.<\/li>\n\n\n\n<li>This method is used when materials are directly taken from a specified location.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><br><strong>Movement Date<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Movement Date<\/strong> is automatically set to today\u2019s date by default, but you can adjust this if necessary. This date will be used for tracking and reporting material movements in the system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><br><strong>Transaction Confirmation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">After selecting the relevant project, materials, and movement date:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Confirm<\/strong> the transaction to issue the selected materials to the project.<\/li>\n\n\n\n<li>iDempiere will automatically update the <strong>inventory<\/strong> and the <strong>project\u2019s material expenses<\/strong>, ensuring that everything is properly tracked.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"698\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-IssueToProject.png\" alt=\"TenthPlanet-iDempiere-ProjectManagement-IssueToProject\" class=\"wp-image-17737\" title=\"\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-IssueToProject.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-IssueToProject-300x204.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-IssueToProject-768x524.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><div class=\"epyt-video-wrapper\"><iframe loading=\"lazy\"  id=\"_ytid_14556\"  width=\"800\" height=\"450\"  data-origwidth=\"800\" data-origheight=\"450\"  data-relstop=\"1\" src=\"https:\/\/www.youtube.com\/embed\/Gizw6BMlsYg?enablejsapi=1&autoplay=0&cc_load_policy=0&cc_lang_pref=&iv_load_policy=1&loop=0&rel=0&fs=1&playsinline=0&autohide=2&theme=dark&color=red&controls=1&disablekb=0&\" class=\"__youtube_prefs__  no-lazyload\" title=\"YouTube player\"  allow=\"fullscreen; accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen data-no-lazy=\"1\" data-skipgform_ajax_framebjll=\"\"><\/iframe><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In iDempiere ERP, Issue to Project enables users to issue materials directly to a project. This process is typically used [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56,10],"tags":[],"class_list":["post-17708","post","type-post","status-publish","format-standard","hentry","category-idempiere-project-management","category-idempiere-product"],"_links":{"self":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/17708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/comments?post=17708"}],"version-history":[{"count":2,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/17708\/revisions"}],"predecessor-version":[{"id":29703,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/17708\/revisions\/29703"}],"wp:attachment":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/media?parent=17708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/categories?post=17708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/tags?post=17708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}