{"id":17826,"date":"2026-01-30T12:47:35","date_gmt":"2026-01-30T12:47:35","guid":{"rendered":"https:\/\/tenthplanet.in\/idempiere\/?p=17826"},"modified":"2026-01-30T12:47:37","modified_gmt":"2026-01-30T12:47:37","slug":"how-cost-adjustment-works-in-idempiere","status":"publish","type":"post","link":"https:\/\/tenthplanet.in\/idempiere\/how-cost-adjustment-works-in-idempiere\/","title":{"rendered":"How Cost Adjustment Works in iDempiere"},"content":{"rendered":"\n<p>The <strong>Cost Adjustment<\/strong> in iDempiere lets you <strong>manually adjust the cost price of products in inventory<\/strong>. This is used when historical or system-calculated costs need correction \u2014 for example after an audit, pricing change, or reconciliation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cost Adjustment Importance<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Corrects <strong>product cost values<\/strong> without directly editing underlying cost tables<\/li>\n\n\n\n<li>Ensures <strong>inventory valuation accuracy<\/strong><\/li>\n\n\n\n<li>Drives correct <strong>profit, margin, and cost accounting<\/strong><\/li>\n\n\n\n<li>Creates <strong>GL postings<\/strong> for cost differences automatically<\/li>\n<\/ul>\n\n\n\n<p>Adjustments are transparent and auditable, with tracking in cost detail records.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><br><strong>Cost Adjustment<\/strong> U<strong>sage<\/strong><\/h2>\n\n\n\n<p>In iDempiere, first navigate to the Cost Adjustment menu and create a new record to open the header. In the\u00a0<strong>Cost Adjustment tab<\/strong>, enter essential document details including\u00a0<strong>Document Type<\/strong>\u00a0,\u00a0<strong>Costing Method<\/strong>\u00a0,\u00a0<strong>Movement Date<\/strong>\u00a0, and\u00a0<strong>Currency\/Currency Type<\/strong>\u00a0(for proper financial postings and conversions). Once header details are complete, move to the\u00a0<strong>Lines tab<\/strong>\u00a0to select specific\u00a0<strong>Products<\/strong>\u00a0and\u00a0<strong>Attribute Set Instances<\/strong>\u00a0(lot\/serial numbers), specify the\u00a0<strong>New Cost Price<\/strong>, then click\u00a0<strong>Process Inventory Count<\/strong>\u00a0to apply adjustments across inventory records.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"691\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-1024x691.png\" alt=\"TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1\" class=\"wp-image-17829\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-1024x691.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-300x203.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-768x518.png 768w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-1536x1037.png 1536w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-1-2048x1383.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><br><strong>Adjustment Lines<\/strong><\/h2>\n\n\n\n<p>Under the <strong>Cost Adjustment Lines<\/strong> tab:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Select the <strong>Product<\/strong> whose cost you want to adjust<\/li>\n\n\n\n<li>System displays the <strong>Current Cost Price<\/strong><\/li>\n\n\n\n<li>Enter your <strong>New Cost Price<\/strong><\/li>\n\n\n\n<li>The difference between current and new cost is recorded<\/li>\n\n\n\n<li>Optionally add <strong>Charges<\/strong> for cost allocation (e.g., handling or restocking charges)<\/li>\n<\/ul>\n\n\n\n<p>This lets you define exactly <em>how much<\/em> and <em>why<\/em> cost is changing.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"691\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-1024x691.png\" alt=\"TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2\" class=\"wp-image-17833\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-1024x691.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-300x203.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-768x518.png 768w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-1536x1037.png 1536w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-2-1-2048x1383.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><br><strong>Adjustment Processing<\/strong><\/h2>\n\n\n\n<p>Once the lines are complete:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Process (Complete) the Cost Adjustment document<\/li>\n\n\n\n<li>iDempiere calculates the <strong>difference between current and new cost price<\/strong> for each line<\/li>\n\n\n\n<li>A <strong>cost detail record<\/strong> is created to record this change<\/li>\n\n\n\n<li>Financial postings are generated to:\n<ul class=\"wp-block-list\">\n<li>Adjust the <strong>product asset value<\/strong><\/li>\n\n\n\n<li>Post the <strong>cost difference<\/strong> to the configured cost adjustment account<\/li>\n\n\n\n<li>If a specific <strong>charge account<\/strong> is selected for a line, that account is used instead of the default cost adjustment account.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"338\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-1024x338.png\" alt=\"TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3\" class=\"wp-image-17834\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-1024x338.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-300x99.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-768x253.png 768w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-1536x507.png 1536w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-InventoryManagement-CostAdjustment-3-2048x676.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><br><br>The <strong>Cost Adjustment <\/strong>in iDempiere allows businesses to <strong>manually correct product cost prices<\/strong> and ensure inventory valuation and financial records reflect the most accurate cost data. It supports key costing methods and creates both cost detail and accounting entries automatically.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Cost Adjustment in iDempiere lets you manually adjust the cost price of products in inventory. This is used when [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-17826","post","type-post","status-publish","format-standard","hentry","category-inventory"],"acf":[],"_links":{"self":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/17826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/comments?post=17826"}],"version-history":[{"count":0,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/17826\/revisions"}],"wp:attachment":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/media?parent=17826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/categories?post=17826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/tags?post=17826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}