{"id":18089,"date":"2026-01-29T11:23:48","date_gmt":"2026-01-29T11:23:48","guid":{"rendered":"https:\/\/tenthplanet.in\/idempiere\/?p=18089"},"modified":"2026-01-30T10:01:13","modified_gmt":"2026-01-30T10:01:13","slug":"how-to-create-project-type-in-idempiere","status":"publish","type":"post","link":"https:\/\/tenthplanet.in\/idempiere\/how-to-create-project-type-in-idempiere\/","title":{"rendered":"How to create project type in iDempiere"},"content":{"rendered":"\n<p>To standardize project creation and reduce manual setup, iDempiere allows users to configure<br><strong>Project Types<\/strong> with predefined phases and tasks.<\/p>\n\n\n\n<p>This configuration enables the automatic population of project structures, ensuring consistency across similar projects and improving setup efficiency.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Creating a Project Type<\/strong><\/h2>\n\n\n\n<p>The first step is to create a Project Type. The Project Type acts as a reusable template that defines how projects are structured, including their category, phases, and tasks.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Navigating to the <strong>Project Type<\/strong> window<\/li>\n\n\n\n<li>Creating a new Project Type record<\/li>\n<\/ol>\n\n\n\n<p>A well-defined Project Type ensures uniform project setup and alignment with organizational processes. Once the Project Type is created, essential attributes must be defined to control how projects behave when they are created using this type.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Configuration includes<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Entering a meaningful <strong>Project Type name<\/strong><\/li>\n\n\n\n<li>Selecting the applicable <strong>Organization<\/strong><\/li>\n\n\n\n<li>Providing <strong>Description<\/strong> and <strong>Comments<\/strong> for clarity and documentation (if required)<\/li>\n<\/ul>\n\n\n\n<p>These details help users identify the purpose and usage of the Project Type during project creation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"491\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-1-1.png\" alt=\"\" class=\"wp-image-18249\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-1-1.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-1-1-300x144.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-1-1-768x368.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Defining the Project Category<\/strong><\/h2>\n\n\n\n<p>The Project Category determines the functional behavior of the project and how costs, revenues, and structures are managed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Available project categories include<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Asset Project<\/strong><\/li>\n\n\n\n<li><strong>General<\/strong><\/li>\n\n\n\n<li><strong>Service (Charge) Project<\/strong><\/li>\n\n\n\n<li><strong>Work Order (Job)<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>Note:<\/strong> Selecting the <strong>Service (Charge) Project<\/strong> category enables automatic population of project phases and tasks from the Project Type\u2019s <strong>Standard Phase<\/strong> and <strong>Standard Task<\/strong> definitions during project creation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"491\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-2.png\" alt=\"\" class=\"wp-image-18250\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-2.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-2-300x144.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-2-768x368.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Defining Standard Phases for the Project Type<\/strong><\/h2>\n\n\n\n<p>Standard Phases represent predefined stages of execution that can be reused across multiple projects.<\/p>\n\n\n\n<p>After selecting the appropriate project category, standard phases can be configured as follows<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Create a new <strong>Standard Phase<\/strong><\/li>\n\n\n\n<li>Enter the <strong>Phase Name<\/strong><\/li>\n\n\n\n<li>Maintain <strong>Description<\/strong> and <strong>Comments<\/strong> if required<\/li>\n\n\n\n<li>Assign the <strong>Product<\/strong> and <strong>Planned Quantity<\/strong> needed for the phase<\/li>\n<\/ul>\n\n\n\n<p><strong>Note:<\/strong> The Standard Phase is automatically added to the project when<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The project line level is set to <strong>Phase<\/strong><\/li>\n\n\n\n<li>The Project Type uses the <strong>Service (Charge) Project<\/strong> category<\/li>\n<\/ul>\n\n\n\n<p>This ensures consistent phase-level planning across projects.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-3.png\" alt=\"\" class=\"wp-image-18251\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-3.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-3-300x168.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-3-768x431.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Defining Standard Tasks for Each Phase<\/strong><\/h2>\n\n\n\n<p>Standard Tasks allow detailed planning within each phase and define the operational activities required to complete the project.<\/p>\n\n\n\n<p>Task configuration includes<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Creating a new <strong>Standard Task<\/strong> under the Standard Phase<\/li>\n\n\n\n<li>Entering the <strong>Task Name<\/strong><\/li>\n\n\n\n<li>Maintaining <strong>Description<\/strong> and <strong>Comments<\/strong> if required<\/li>\n\n\n\n<li>Assigning the <strong>Product<\/strong> and <strong>Planned Quantity<\/strong> needed for the task<\/li>\n<\/ul>\n\n\n\n<p><strong>Note:<\/strong> Standard Tasks are automatically added to the project under the corresponding phase when<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The project line level is set to <strong>Task<\/strong><\/li>\n\n\n\n<li>The Project Type uses the <strong>Service (Charge) Project<\/strong> category<\/li>\n<\/ul>\n\n\n\n<p>This automation ensures faster project setup and accurate task-level planning.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-4.png\" alt=\"\" class=\"wp-image-18253\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-4.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-4-300x168.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-ProjectType-4-768x431.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>By configuring Project Types with predefined categories, phases, and tasks<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Projects are created with a standardized structure<\/li>\n\n\n\n<li>Manual data entry is reduced significantly<\/li>\n\n\n\n<li>Planning accuracy and consistency are improved across similar projects<\/li>\n<\/ul>\n\n\n\n<p>This setup enables efficient project initialization while ensuring alignment with organizational project management practices.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To standardize project creation and reduce manual setup, iDempiere allows users to configureProject Types with predefined phases and tasks. This [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[56],"tags":[],"class_list":["post-18089","post","type-post","status-publish","format-standard","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/18089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/comments?post=18089"}],"version-history":[{"count":0,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/18089\/revisions"}],"wp:attachment":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/media?parent=18089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/categories?post=18089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/tags?post=18089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}