{"id":18100,"date":"2026-01-30T09:25:32","date_gmt":"2026-01-30T09:25:32","guid":{"rendered":"https:\/\/tenthplanet.in\/idempiere\/?p=18100"},"modified":"2026-01-30T10:05:27","modified_gmt":"2026-01-30T10:05:27","slug":"how-to-create-a-project-with-phases-to-generate-production-from-project","status":"publish","type":"post","link":"https:\/\/tenthplanet.in\/idempiere\/how-to-create-a-project-with-phases-to-generate-production-from-project\/","title":{"rendered":"How to create a project with phases to generate production from project"},"content":{"rendered":"\n<p>To manage project execution effectively, iDempiere allows users to create projects with <strong>phase-level planning<\/strong>. This approach enables structured cost planning, quantity estimation, and seamless integration with production and accounting.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Creating a New Project<\/strong><\/h2>\n\n\n\n<p>The first step is to create a project and define its planning level. Setting the correct line level determines how costs and quantities are tracked within the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Project creation includes<\/strong><\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Navigating to the Project window<\/li>\n\n\n\n<li>Creating a new Project record<\/li>\n\n\n\n<li>Setting the Line Level to <strong>Phase<\/strong><\/li>\n<\/ol>\n\n\n\n<p>Defining the project at the phase level allows planning and tracking to be done at each execution stage.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-1-2.png\" alt=\"\" class=\"wp-image-18259\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-1-2.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-1-2-300x168.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-1-2-768x431.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-2-2.png\" alt=\"\" class=\"wp-image-18260\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-2-2.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-2-2-300x168.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-2-2-768x431.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Defining Project Phases<\/strong><\/h2>\n\n\n\n<p>Phases represent major stages of project execution and help organize work, costs, and timelines.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Phase configuration includes<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Creating a new <strong>Phase<\/strong> under the project<\/li>\n\n\n\n<li>Entering a clear <strong>Phase Name<\/strong><\/li>\n\n\n\n<li>Maintaining <strong>Description<\/strong> and <strong>Comments<\/strong> for reference<\/li>\n\n\n\n<li>Defining the <strong>Start Date<\/strong> and <strong>End Date<\/strong>, if applicable<\/li>\n<\/ul>\n\n\n\n<p>Well-defined phases improve visibility into project progress and scheduling.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"679\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-4-1.png\" alt=\"\" class=\"wp-image-18261\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-4-1.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-4-1-300x199.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-4-1-768x509.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Creating Phase Lines for Planning and Production<\/strong><\/h2>\n\n\n\n<p>Phase Lines are used to define the products, quantities, and costs planned for each phase. These lines drive production, costing, and margin calculations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Phase line setup includes<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Creating a new <strong>Phase Line<\/strong><\/li>\n\n\n\n<li>Selecting the <strong>BOM Product<\/strong> created earlier for production<\/li>\n\n\n\n<li>Entering the <strong>Planned Price<\/strong> for the product<\/li>\n\n\n\n<li>Entering the <strong>Planned Quantity<\/strong> required for the phase<\/li>\n<\/ul>\n\n\n\n<p>This configuration links project planning directly with manufacturing and inventory processes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"707\" src=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-6-1.png\" alt=\"\" class=\"wp-image-18262\" srcset=\"https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-6-1.png 1024w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-6-1-300x207.png 300w, https:\/\/tenthplanet.in\/idempiere\/wp-content\/uploads\/sites\/13\/2026\/01\/TenthPlanet-iDempiere-ProjectManagement-Project-6-1-768x530.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Planned Amount and Margin Calculation<\/strong><\/h2>\n\n\n\n<p>Once the planned price and quantity are entered, iDempiere automatically calculates financial values for the phase line.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Automatic calculations include<\/strong><\/h3>\n\n\n\n<p><strong>Planned Amount = <\/strong>Planned Price \u00d7 Planned Quantity<\/p>\n\n\n\n<p><strong>Planned Margin = <\/strong>(Planned Price \u2212 Limit Price) \u00d7 Planned Quantity<\/p>\n\n\n\n<p>These calculations help users evaluate expected profitability and cost control at the planning stage.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>By creating projects with phase-level planning<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project costs and quantities are clearly defined upfront<\/li>\n\n\n\n<li>Production can be generated directly from project phases<\/li>\n\n\n\n<li>Planned margins provide early visibility into project profitability<\/li>\n<\/ul>\n\n\n\n<p>This structured approach ensures accurate planning, better cost control, and smooth integration between Project Management, Manufacturing, and Accounting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To manage project execution effectively, iDempiere allows users to create projects with phase-level planning. This approach enables structured cost planning, [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[56],"tags":[],"class_list":["post-18100","post","type-post","status-publish","format-standard","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/18100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/comments?post=18100"}],"version-history":[{"count":0,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/posts\/18100\/revisions"}],"wp:attachment":[{"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/media?parent=18100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/categories?post=18100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tenthplanet.in\/idempiere\/wp-json\/wp\/v2\/tags?post=18100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}