How to Manage Manufacturing in 3steps in Odoo18
This is the most advanced workflow, involving 1. Picking components, 2. Manufacturing, and 3. Moving finished goods to a specific “Post-production” or “Finished Goods” area.
- Full Cycle: Pick components -> Manufacture -> Store finished product.
- Configuration: Set the warehouse manufacturing to “Pick components, manufacture, and then store products (3 steps).”
- Component Picking: Just like the 2-step process, materials are first staged in the production area.
- Manufacturing Phase: The production happens, consuming staged materials and creating the product.
- Store Finished Product: A final, third operation is created to move the item from the production floor to its final warehouse shelf.
- Quality Control Check: The video notes this is a perfect time to insert a quality check before final storage.
- Large Scale Operations: This is recommended for large warehouses where production and storage are far apart.
- Strict Control: It ensures that finished products aren’t “lost” on the factory floor and are properly shelved.
